HEADSPRING
๐Project Metrics
TDLR #EABPRJB2810392Project Closed
Project has been completed and closed
๐Scope of Work
TENANT INTERIOR FINISH OUT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$337K total๐๏ธSame Design Firm
$106.0M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change Out: Install/ Replace 40 gallon tank-type natural gas water heater.
Shut-down request for installation of MPU in correlation with AUX permit 2025-054435 EP (using existing UM)
Install 16 (405W) roof mounted solar panels 6.480 kW solar service system tying into new 200 AMP rated MSP
Interior remodel of level 2 restrooms. (Floor 2)
Interior remodel of level 2 restrooms.