๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

ACC HIGHLAND PHASE II

6101 AIRPORT BLVD, Austin, TX 78752, Austin, TX, 78752
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB7802307
$80.0M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
2 years
Duration
Registered:Oct 10, 2016
Start:Sep 1, 2017
Target:Sep 1, 2019
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

Major renovation of a portion of the former Highland Mall (the original 1970 construction) to be used for higher

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
October 10, 2016
Construction Start
September 1, 2017
Expected Completion
September 1, 2019

๐Ÿ“„Related City Permits

Building permits found at or near this location

6101 MOUNTAIN VILLA CV

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutDec 2025
View Details
2025-156733 MP
๐Ÿ”งMcCullough Heating & Air
6101 LONDON DR

Tunnel approx 20ft to repair belly within drain system.

FinalPlumbing PermitRepairDec 2025
View Details
2025-155005 PP
๐Ÿ”งG & M Plumbing
6101 HIGHLAND CAMPUS DR BLDG 3000

Remodel of an existing dumpster enclosure located on existing impervious cover at an existing college campus is proposed; no change to impervious cover is proposed. Rework/reuse of gates on existing dumpster enclosure for ease of pickup and drop off of trash and recycle bins.

ActiveBuilding PermitRemodelDec 2025
View Details
2025-071227 BP
๐Ÿ”งSpawglass Contractors Inc
6101 HIGHLAND CAMPUS DR BLDG 3000

Replacement of failing double doors within existing Building 3000; addition of card readers at three sets of doors; replacement of roof ladder with a new ladder on Building 3000.

ActiveBuilding PermitRemodelDec 2025
View Details
2025-071225 BP
๐Ÿ”งSpawglass Contractors Inc
6101 HYSIDE DR

Express - Upgrade Remodel: Remove shingles roof and change to metal. Change all the Sheetrock and paint plugs and fans sinks and toilets new shower [no plumbing moving] replacing windows [like for like] New AC Units change outside siding no structural will be move just bringing everything up to code.

ActiveMechanical PermitRepairNov 2025
View Details
2025-142150 MP
๐Ÿ”งPruneda Construction Inc.

Quick Actions

TDLR ID: EABPRJB7802307

Property Owner

๐Ÿ‘ค
AUSTIN COMMUNITY COLLEGE DISTRICT
4 projects ยท $132.8M
PAMELA COLLIER 5930 MIDDLE FISKVILLE ROAD, AUSTIN, TX 78752

Design Firm

Registered Accessibility Specialist

๐Ÿ“‹
HAYNIE, CLARENCE
RAS #54
PO BOX 9063, AUSTIN, TX 78766