PLAZA SALTILLO BLOCK 3-COMMERCIAL
๐Project Metrics
TDLR #EABPRJB7809079Project Closed
Project has been completed and closed
๐Scope of Work
3 level garage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$22.0M total๐๏ธSame Design Firm
$94.7M total๐Related City Permits
Building permits found at or near this location
Tunnel from bathroom to bathroom 100 feet. Open a hole behind master bathroom and another one behind guest bathroom to tunnel in. Tunnel will go across under the house and connect to the kitchen sink on the way. Make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. Tear out all old cast iron and carry off. Replace with schedule 40 PVC. It will run out from under the master bathroom and tie onto the main line. Put in a new cleanout for the main and a new line running over to the main line in the yard. Put in a new backwater valve in 4 pipe. Run a new line for the washer/dryer and possibly a new vent and washer box. In bathrooms: install new P-traps and toilet flanges and reset all toilets. Note: All 2 and 3 PVC will be hung at 4 foot intervals with stainless steel hangers.
New pool (26x12) and spa (8x8). Removing 219 sqft of existing concrete deck and 15ft concrete pad
Service upgrade
New pool (26x12) and spa (8x8). Removing 219 sqft of existing concrete deck and 15ft concrete pad
New 2-story 2 bedroom two bathroom dwelling unit with covered porch.