FIRST UMC PARKING LOT
๐Project Metrics
TDLR #EABPRJB8801058Project Closed
Project has been completed and closed
๐Scope of Work
Construction of 27-spot parking lot.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$10.4M total๐๏ธSame Design Firm
$307K total๐Related City Permits
Building permits found at or near this location
Install new gas line for generator
Express- replace existing tub with new tub and surround; replace existing bathroom window.
Express- replace existing tub with new tub and surround; replace existing bathroom window.
New construction 2-unit use duplex: 1205 - New construction single-family residential 3-story 2 bedroom 2.5 bath with attached 2-car carport covered front porch covered rear patio and 2nd floor balcony.
14kW whole home generator (Natural Gas) connected to house meter and main panel. 200amp electrical service upgrade (approved ESPA attached to permit). Austin Energy disconnect required. (Sunil Verma)