TRAIL BRIDGE AT CONGRESS AVENUE
๐Project Metrics
TDLR #EABPRJB8808560Project Closed
Project has been completed and closed
๐Scope of Work
Construction of a hike/bike bridge with overlook structure and minor trail realignment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.0M total๐Related City Permits
Building permits found at or near this location
Add EV Charging
New construction single-family residential 1-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 3-car garage covered front porch and covered rear patio.
Install 200 amp OH construction loop from AE pole 236371 RE: Building Permit 2025-155218
Replacement of mini-split system St David *This is a separate job not related to anything existing. The mini split is located on the 2nd floor central by AHUs 2&3. It serves the fire control room.