PORTABLE BLDG
📊Project Metrics
TDLR #EABPRJB8815592Inspection Complete
Final inspection completed, awaiting project closure
📋Scope of Work
Place portable bldg on site
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Permanent meter rack service only
Tunnel under foundation to replace cast iron pipe for one full bathroom and main drain line. Total lenght of pipe replaced is 45 feet and total length of tunnel is approximately 45 feet. 2 access holes will be made one in the front and one in the back.
Install new 5.525 kw rooftop solar system and 10kw energy storage system for existing residential only.
Disconnect/reconnect to Upgrade main distribution panel.
express - remove and replace 13 windows and 1 door