Meanwhile Brewing
๐Project Metrics
TDLR #TABS2019004394Project Closed
Project has been completed and closed
๐Scope of Work
New construction of a 3,565 sf Tasting Bldg. and New 12,809 sf Brewery with 1,508 sf 2nd floor office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.6M total๐Related City Permits
Building permits found at or near this location
(Davis Rick) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Tunnel under home about 20ft to replace drain line with schedule 40 PVC. Also will repair part of the yard drain line where there is a root intrusion and replace homeowner shut off valve. **main sewer line NO TUNNEL JOB DONE ONLY YARD LINE
Install new gas yard line for a generator.
Replacement of complete existing central heat and air system with or without duct work
Express: We will replace the siding around the chimney from top to bottom with lap siding.