Brentwood Elementary School AISD modernization
๐Project Metrics
TDLR #TABS2020011175Project Closed
Project has been completed and closed
๐Scope of Work
ADDITIONS AND RENOVATIONS TO THE CONFERENCE CENTER
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$68.6M total๐Related City Permits
Building permits found at or near this location
EXPRESS: 2600 Sqft decking removal and replacement
Express- Foundation repair on a slab foundation. Install 10 total press piling pier locations along the perimeter. There will be 1 breakthrough and patched location. We will improve level to the extent.
Disconnecting old black iron piping and replacing with 45ยฟ CCST gas piping includes grounding the gas pipe on the exterior of the building. After installation will test for leaks if any leaks are discovered in the areas that we did not install the new CCST we would need to Run an hourly rate of 350 until there are no more leaks in the system.
Replacement of complete existing central heat and air system with or without duct work
Express: replace one window like for like replace one door like for like (exempt)