Connally High School Locker Room Renovation
๐Project Metrics
TDLR #TABS2020018666Project Closed
Project has been completed and closed
๐Scope of Work
Locker and locker bench repair and replacements, interior refinish including repainting walls and ceilings and resurfacing locker room floors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$77.5M total๐Related City Permits
Building permits found at or near this location
Install Level 2 EV Charger
Estonian 3316 B Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.93 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 31 Actual Bld height: 30-4 required parking: 2.
Safety and security upgrades to existing Public Education Facility. Extended to 12/31/21 as per Mayors orders 6/7/21 -MO
ETJ New Construction of SFR 2132 sq ft
Replace three existing mini-split systems and Kitchen Hood for existing Connally High School