The Ballroom
๐Project Metrics
TDLR #TABS2021018718Review Complete
Design review complete, construction may proceed
๐Scope of Work
Renovation to include addition of a rear fire exit stair, two restrooms with 6 fixtures each, and 13 total hand washing sinks. The project is approx. 950sf of impacted area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$28.4M total๐Related City Permits
Building permits found at or near this location
Removal/reinstallation of existing solar system. AE. No changes being made.
Install Level 2 EV Charger
Replacement of complete existing central heat and air system with or without duct work Replacing three split systems with like-for-like at FS 17
Replace overhead water lines. Replace a yard pipe up to 10ยฟft in length.
1000 AMP temp power for duration of construction. power crane hoist and garage.