220005-DAVIS AISD Davis Elementary Renovations
📊Project Metrics
TDLR #TABS2022004729Project Closed
Project has been completed and closed
📋Scope of Work
Removing existing WHP from (5) classrooms, replacing with rooftop units, mechanical ductwork and supply/return; regrading courtyard to provide positive drainage; replacing damaged flooring with LVT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
📄Related City Permits
Building permits found at or near this location
Service Upgrade
Emergency Replaced all damaged overhead materials ***Storm Related-Emergency inspection done on 6/1/25. ESPA is required-Hyatt***
Replacement of complete existing central heat and air system with or without duct work
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.