Aero Capital Solutions Expansion
๐Project Metrics
TDLR #TABS2022005912Project Closed
Project has been completed and closed
๐Scope of Work
Renovation of existing tenant suite, including partial demolition and construction of new private offices and Break Room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$7.1M total๐Related City Permits
Building permits found at or near this location
26kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Julie Ledbetter)
Installation of sewer yard line and grinder pump.
Whole house repipe as well as installing a tankless gas water heater to replace current one
Install Honeywell Generator and Automatic Transfer switch. wiring will be run from meter socket to the new transfer switch then generator then to 200 amp main breaker panel
Replacement of complete existing central heat and air system with or without duct work