EV Charging Stations - Norwood Park Plaza
๐Project Metrics
TDLR #TABS2022017357Review Complete
Design review complete, construction may proceed
๐Scope of Work
Installation of 4 electric vehicle charging stations, servicing 6 EV stalls, including new service from utility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$504K total๐Related City Permits
Building permits found at or near this location
Install 1-20A 2-pole circuit from existing Pano breaker box to Pano UPS. Install UPS and grounding
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas system (upstairs)
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Equipment hvac replacement only. Keep existing air ducts
Interior remodel: Install fixture layout doors relocate/remove fixtures on sales floor revise location of registers and checkouts in customer front end checkout area revise money center