ABIA Existing Terminal Centralized Baggage Handling System Upgrades
๐Project Metrics
TDLR #TABS2022022043Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Expansion of the checked baggage system, security screening check point and additional tenant offices/lounge. Removal and relocation of select utility lines above head to allow new baggage system equipment installation at the exterior Apron.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$22.8M total๐Related City Permits
Building permits found at or near this location
Installation of New Irrigation
Installation of New Irrigation
EMERGENCY REPAIR of OH meter and service for railroad.
Express: Foundation Repair
Construct new driveway approach of 10 FT 8.5IN and sidewalk of 160 LF. Driveway approach is from alley.