📋Project Registered🔧 Renovation/Alteration💵 This project is privately funded, on private land for private use.

Laundromat

719 W William Cannon Dr,Unit 110, Austin, TX 78745, Austin, TX, 78745
Pre-Construction15%

📊Project Metrics

TDLR #TABS2023005395
$120K
Project Value
3,724
Square Feet
$32/sqft
Cost/SqFt
5 months
Duration
Registered:Nov 15, 2022
Start:Nov 30, 2022
Target:Apr 29, 2023
📋

Project Registered

Project has been registered with TDLR and is in pre-construction phase

📋Scope of Work

Laundromat located on 719 W William Cannon in the areaDr,Unit 110 provides services of laundry

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
November 15, 2022
Construction Start
November 30, 2022
Expected Completion
April 29, 2023

📄Related City Permits

Building permits found at or near this location

719 CASTLE RIDGE RD

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutDec 2025
View Details
2025-157946 MP
🔧McCullough Heating & Air
719 E 6TH ST

OLD 6TH - Minor Exterior remodel new windows and entry door in existing openings demolition of non historic rear addition no change in height no increase in square footage. Historic approved.

FinalElectrical PermitRemodelNov 2025
View Details
2025-061218 EP
🔧Airco Mechanical LTD
719 W WILLIAM CANNON DR UNIT 112

Remodel an interior space non structure

FinalBuilding PermitRemodelOct 2025
View Details
2025-124285 BP
🔧Pruneda Construction***MAIN**
719 HARRIS AVE

This option is going to include performing a tunnel underneath the foundation on the left side of the home. We will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new PVC and will bring out the PVC to the left side of the home and will tie back in to the PVC line that is located on that left side. This is going to take care of the cast-iron for units a. We will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. Then we will go from the back of unit B and we¿ll have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen And toilet drain and will be redoing with PVC and will tie on to the existing PVC that is located under home. We are going to be canceling out the cast-iron line that runs about 80 feet across the two units. Once we have all the PVC set in place we will strap to foundation to prevent any movement in the future And will thoroughly test once we are completed. We are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. Once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector.

ActivePlumbing PermitRepairSep 2025
View Details
2025-119228 PP
🔧Blue Ribbon Services
719 HARRIS AVE

Overhead service rebuild on duplex. Two meters and two panels with 100-amp main breakers

FinalElectrical PermitRepairSep 2025
View Details
2025-109983 EP
🔧FOX SERVICE COMPANY

Quick Actions

TDLR ID: TABS2023005395

Property Owner

👤
First Canaan Partners INC,
Contact: Nada Al Bizreh
1900 E Anderson LN, Suit 103, Austin, Texas 78752

Design Firm

🏛️
Archizone
1620 Bryant Dr, Unit 2 2903, Round Rock, Texas 78664

Tenant

🏢
Ziyad Kasey