98 San Jacinto Center - L8 & L9 Norton Fullbright Stair Infill
๐Project Metrics
TDLR #TABS2023009757Project Closed
Project has been completed and closed
๐Scope of Work
INTERIOR RENOVATION INVOLVES THE REMOVAL AND MODIFICATION OF THE STAIR AND RAILING EXTENTION OF THE COMMUNICATING STAIR (THAT CONNECTS LEVELS 8-11) FROM LEVEL 8 TO 9, AS WELL AS THE INFILL OF THE FLOOR SLAB AT LEVEL 9 WITH MECHANICAL AND ELECTRICAL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.4M total๐๏ธSame Design Firm
$21.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 3 ton and 3.5 ton single stage Goodman system. New GLXS4 condenser and horizontal coil on R32 refrigerant with GR9S furnace.
TENANT FINISH OUT OF WOMENS INPATIENT BEDS (3) APPLICATIONS
TENANT FINISH OUT OF WOMENS INPATIENT BEDS (3) APPLICATIONS
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 12-DB-R. This is a 3 Story building with height of 38-6 and 3405 square feet.
New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 9-CB-L. This is a 2 Story building with height of 31-7 and 3129 square feet.