Circle K Austin S I-35
๐Project Metrics
TDLR #TABS2023022733Review Complete
Design review complete, construction may proceed
๐Scope of Work
This is a project to install (2) ABB Terra 184 dispensers and prep for the future installation of (2) additional ABB Terra chargers; (1) switchboard; (1) transformer; light pole; new concrete curb and parking striping in the existing parking lot.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$976K total๐๏ธSame Design Firm
$2.2M total๐Related City Permits
Building permits found at or near this location
New construction 200 sq ft accessory structure detached 1-story studio space covered front porch. No meter can installed just wiring.
200-amp Panel and meter upgrade
ePlan-Expedited Review: [APPROVED] Install Utility Transformer to Existing Gas Station Switchgear (2) ABB Terra EV Dispensers New Parking Striping and Stencil Relocate Tree Remove 20 Light Poles and Install 1 Light Pole Remove Portion of Existing Concrete Curb and Install New Curb. (1500 SF)
Express: window replacement (four windows like for like) siding repair
REPLACE ACM AROUND ENTIRE EXISTING FUEL CANOPY. 1237.5 SQUARE FEET OF ACM.