Westwood CTE Renovation - Health Sciences
๐Project Overview
๐Scope of Work
Replacement of casework and flooring, repaint; adding plumbing, operable window, cubicle curtains and a door
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Round Rock ISD
๐Related Austin Permits
City permits found at this location
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Tower scope 1 Install new mount modification per plans 6 Cellmax antennas 3 Ericsson air antennas 3 Ericsson radios.
Interior fit-out of existing shell space for new MRI and Neurology Suite.
Interior fit-out of existing shell space for new MRI and Neurology Suite.
Interior fit-out of existing shell space for new MRI and Neurology Suite.