Meta AUS1 L21
๐Project Overview
๐Scope of Work
TENANT FIT-UP, CONSTRUCTION INCLUDING NON-BEARING INTERIOR PARTITIONS, OFFICE GLASS STOREFRONTS, DOORS, FLOOR/WALL FINISHES, REPLACING DAMAGED CEILING
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
***PER COORDINATION WITH 2023 141444 EX THIS PROJECT NOT SCHEDULED TO BEGIN UNTIL SOMETIME AFTER 06/24/24*** ***ALL WORK OCCURRING BEHIND EXISTING CLOSURES SET UNDER 2022-006003 RW UNTIL CONTRACTOR Ryan CLEARS THE ROW THEN ALTERNATIVE TCP MUST BE USED*** Construct new driveway approach of 24 FT and sidewalk of 141 LF and curb & gutter of 179 FT. *rs Inspection Fees paid under SSI# 2022 048573 DAPCZ Project Name: 321 W 6th St Clean Scapes will install 170 linear feet of new sidewalk 195 linear feet of new curb/gutter and one new Type 2 driveway at the south side of 6th Street (segment located between Guadalupe and Lavaca Streets). All work will take place behind existing TCP (attached). I have begun reviewing your application request. For more information on our permit requirements visit: https://www.austintexas.gov/page/right-way-permits-drivewaysidewalks The items below MUST be provided before review can continue. Reply to this email once you have uploaded all required items to the ABC Portal. A response must be provided within 30 days or your request may be rejected due to inactivity: *DAPCZ project name *Provide all pages of TCP along with Berricading Summary table. *The site plan doesnยฟt reflect with the work description provided. Please highlight the work scopes in site plan for better understanding. *Detailed description of work being done (GUADALUPE STREET) - Driveway width from expansion joint - Total linear footage of sidewalk work done outside of the driveway install - Total linear footage of curb & gutter work done outside of the driveway install *Detailed description of work being done (W 6TH STREET) - Driveway width from expansion joint - Total linear footage of sidewalk work done outside of the driveway install - Total linear footage of curb & gutter work done outside of the driveway install
ePlan-Expedited Review: Interior Remodel and Change of Use from Office to Indoor Entertainment/Office. Work to Include Interior and Exterior Remodel (32036 SF)
2025/03/07 thru 2025/03/15 *A-2 assembly needing Building Permit for tent. Normal events we host here all year long panels and discussions live music on our stages. Bar and Food service. Music artists are local djs singer songwriter indie folk and pop. No national artists.
20X80 ROOFTOP TENT
20X80 & 20X40 TENTS
20X80 & 20X40 TENTS