All Saints Social Hall Renovation
๐Project Overview
๐Scope of Work
Renovation of the back of the existing social hall into offices and a mezzanine totaling 3,750 sq ft.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐๏ธMore by Andersson / Wise Architects
๐Related Austin Permits
City permits found at this location
Electrical service to power small cell site reference 2018 129081 SCP
Small Cell Civil Project reference 2018 129538 Add 150A Meter Can single phase 100A Disconnect All other associated electrical components
Upgrade electrical service only to 800 amps. This is an AE request. CJ Electrical inspector sent back to PR to ensure that traffic bollards would be installed to protect the new electrical service. ROW work would not need a BP and it is technically part of the electrical service work which is included in this permit. AE Design criteria and drawing are uploaded. ROW approval was given by others.
ReRoof
ePlan: Commercial Expedited Review - Installing Electronic Locks to Existing Office 4th floor (30 SF)
Replacement of complete existing central heat and air system with or without duct work in BASEMENT