Landmark Conservancy Phase 2
๐Project Overview
๐Scope of Work
New paint and finishes throughout; convert existing conference room into new package locker room (replace existing window with a door and add new sidewalk and landing outsdie); convert existing theater into a golf simulator room
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by LCP MFIII CONSERVANCY LLC
๐๏ธMore by Jordan Michael Design
๐Related Austin Permits
City permits found at this location
Light interior refresh of multifamily apartment clubhouse lobby & offices. Includes replacement of carpet tile new paint replacement of decorative light fixtures and replacing a section of interior windows and doors with a new interior storefront system.
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater
Cameron S354 A Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Install Sprinkler System
PB: New construction of 1 story SFR with attached garage covered porch and patio 4/3