📋Project Registered🏗️ New Construction💵 This project is privately funded, on private land for private use.
WCW E. Braker Ln
833 E Braker Ln, Austin, TX, 78753
📊Project Overview
$1.5M
Est. Cost
3,579
Square Feet
4 months
Duration
136
Days Left
📋Scope of Work
Pre-Fab built express carwash and vacuum stalls for customers 3579 sf
📅Project Timeline
Registered
November 25, 2025
Construction Start
December 31, 2025
Expected Completion
April 15, 2026
🗺️Location
📄Related Austin Permits
City permits found at this location
833 FAIRFIELD DR BLDG A UNIT 8
2.23 mi awayReplace like for like after a car damage
FinalElectrical PermitRemodelAug 2025
Details
2025-094139 EP
🔧Edumar Electric
833 FAIRFIELD DR BLDG A UNIT 8
2.23 mi awayReplace like for like after a car damage
ActiveBuilding PermitRemodelAug 2025
Details
2025-094139 BP
🔧Infinite Capital Construction
8330 FATHOM CIR UNIT 403
7.35 mi away5 tunnel below the foundation to repair break on laundry drain line. access hole - front
FinalPlumbing PermitRepairAug 2025
Details
2025-104987 PP
🔧Accurate Leak & Line
8330 FATHOM CIR UNIT 403
7.35 mi awayRepair main disconnect panels with a new panel box/boxs only. Units are occupied units #403
FinalElectrical PermitRepairMay 2025
Details
2025-062168 EP
8330 FATHOM CIR UNIT 401
7.35 mi awayRepair main disconnect panels with a new panel box/boxs only. Units are occupied units #401
FinalElectrical PermitRepairMay 2025
Details
2025-062163 EP
8330 FATHOM CIR UNIT 402
7.35 mi awayRepair main disconnect panels with a new panel box/boxs only. Units are occupied units #402
FinalElectrical PermitRepairMay 2025
Details
2025-062166 EP
Property Owner
👤
Strive 1327 Ventures LLC
Contact: Mohamed Ali
8870 Business Park Dr Ste 100, Austin, Texas 78759
(512) 970-4912
Design Firm
Registered Specialist
📋
ROBERT,RONSON
RAS #16
107 MEADOW WOODS DRIVE, KYLE, TX 78640
(512) 787-3687