PAI: PAI TIP Scholars
๐Project Metrics
TDLR #TABS2026007514Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
The project comprises the renovation of an existing suite and conference room including fishes and adding a doorway from one suite to another. The project also includes the renovation of an existing lab to a breakroom.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Install approximately 85 feet of water line this is a replacement job pipe is in the yard not a tunnel The project is scheduled to begin on 12/01/2025.
Replacement of complete existing central heat and air system with or without duct work
Install 1-20A 2-pole circuit from existing Pano breaker box to Pano UPS. Install UPS and grounding
Replacement of an existing water heater 40gal gas tank changeout located in the garage
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas system (upstairs)