Austin Waldorf School
πDevelopment Metrics
Closed
Site plan case is in the system.
πProject Description
The applicant proposes a utility line extension. 11-3-2025 DFD Supervisor AW found an EV folder this one lingering It was placed on the EV Inspection distribution list but somehow dropped off that list into the abyss. It has a 2018 vintage and was never assigned to an inspector (in pending status assigned to Rebekah Barney. Inspector SMS conducted a 14-point closure analysis and found that it had been completed long ago. Terminating this SP and asking SMS to close out the EV folder and release fiscal.
π Entitlement Timeline
ποΈZoning & Land Use Analysis
Existing Conditions
Proposed Development
Review Requirements
πNearby Site Plans
Development activity within ~800m
Applicant / Developer
City Case Manager
Location & Jurisdiction
Property Records
πAll Site Plan Data
Click to expand
πAll Site Plan Data
Click to expandIdentifiers
Project Numbers
Key Dates
Address
Zoning & Land Use
Geographic
Review Status
Applicant
Owner
LOT 1 BLK A AUSTIN WALDORF SCHOOL
The applicant proposes a utility line extension. 11-3-2025 DFD Supervisor AW found an EV folder this one lingering It was placed on the EV Inspection distribution list but somehow dropped off that list into the abyss. It has a 2018 vintage and was never assigned to an inspector (in pending status assigned to Rebekah Barney. Inspector SMS conducted a 14-point closure analysis and found that it had been completed long ago. Terminating this SP and asking SMS to close out the EV folder and release fiscal.