CP731793, CIP102-1290 PHASE 1 (SZB): 2ND & 5TH FLOOR RENO: A I 5TH FLOOR RESEARCH STE & CORRIDOR
๐Project Metrics
TDLR #TABS2020017088Project Closed
Project has been completed and closed
๐Scope of Work
Lev 5 lobby & corridors: including new ceilings and finishes, way findings, signage, new water fountains *lev 5 new office space: new room layout, new finishes, workstations, lounge, reception desk, way finding & signage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$37.4M total๐Related City Permits
Building permits found at or near this location
The home currently has two different sized feeder conductors running from the meter to the main electrical panel. We will remove the existing feeders and install new matching conductors. The replacement feeders will be 2/0 copper (CU) to ensure proper sizing safety and code compliance. All work will be completed per NEC standards and local utility requirements.
1912 S 3rd St (rear unit)- New construction of a 2-Story detached Res. [3bed 2.5bath]. Part of 3-unit use.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Two Stage Gas - DOWNSTAIRS
Installation of solar panels on existing residential roof. 13.64 kW. Addition of 3 0-30A circuits. 31 panels.
Install EVSE