A campus with a local legacy
Austin ISD’s Legacy Schools page lists Dawson Elementary’s years as 1971–2026 and links transition information. Older school-program descriptions should not be treated as current enrollment options.[3]
Austin neighborhood field guide
Get to know the local places, then explore what the public record says: construction, restaurant inspection scores and beverage receipts, with dates and sources beside the data.
Dawson is one of 65 named areas in the City of Austin Neighborhood Planning Areas boundary dataset. The saved source records its planning status as plan approved. These mapped categories differ from colloquial neighborhood names. Districts people name in conversation, like South Congress, Rainey Street or the Sixth Street entertainment district, are not separate areas in this dataset; they sit inside a planning area or straddle two. This boundary is a single polygon in the city's file, with ordinance 19980827-B recorded in the source, and the city last modified it on . The dataset stores the name as DAWSON.
Dawson’s former elementary campus is entering a new chapter. Austin ISD now includes Dawson Elementary in its legacy-school history and publishes a dedicated repurposing process for the site. Read that current district record alongside the neighborhood’s long-established city plan.
4 linked sources · CheckedAustin ISD’s Legacy Schools page lists Dawson Elementary’s years as 1971–2026 and links transition information. Older school-program descriptions should not be treated as current enrollment options.[3]
The district says its board approved a fee-simple sale of the Dawson property on June 18, 2026, and that a request for proposals has been released. The page describes the process; it does not establish a completed sale or a finished new use.[2]
The city records adoption of the Dawson Neighborhood Plan on August 27, 1998. Its planning resources link amendments, the future land-use map and implementation recommendations for understanding neighborhood change.[1]
Austin ISD’s Dawson repurposing page publishes board action, the request for proposals, evaluation materials and community-feedback context. Consult it for current process updates.[2]
Local context is based on the sources below. Confirm current access, schedules, and reservations with the operator. Civic figures elsewhere on this page retain their own reporting periods.
These controls filter the records already on this page. They do not re-query the agencies.
Boundary drawn from City of Austin Neighborhood Planning Areas, as last modified September 22, 2021. Markers are placed from geocoded street addresses, so a record whose address we cannot geocode is listed below but not pinned. The panels under the map are the full text equivalent.
The 25 most recently issued inside this boundary (page limit 25)
Austin Public Health · up to 15 most recent inside this boundary
Texas Dept. of Licensing & Regulation filings · up to 15 inside this boundary
Texas Comptroller mixed-beverage filers we placed inside this boundary
1 of 100 filers in ZIP 78704, 78701, 78741, 78744, 78745 placed inside this boundary. Each venue’s figure is its own gross receipts over its own filing months — there is deliberately no area total, because this is a sample, not a census.
Dawson is one of 65 named areas in the City of Austin neighborhood-planning boundary dataset. Its status in the saved source is plan approved. Inclusion in this file does not by itself mean a neighborhood plan was adopted. Well-known districts such as South Congress, Rainey Street and the Sixth Street entertainment district are not separate areas in this dataset; they sit inside a planning area, or straddle two. The Dawson boundary is a single polygon in the source file. The city last modified it on September 22, 2021.
City of Austin ordinance number 19980827-B is recorded against this planning area in the city's Neighborhood Planning Areas dataset, with planning status plan approved.
City of Austin Development Services has issued 2,052 building permits that it has geocoded inside the Dawson planning-area boundary, the earliest dated August 28, 1978 and the most recent September 30, 2026, for a combined declared construction value of $287,392,061. Declared value is the figure the applicant put on the permit application, not market value or finished cost. Counted from the city's Issued Construction Permits dataset (3syk-w9eu), building permits only, over every issue date in that dataset. The boundary test needs a mapped coordinate, and about one building permit in seven (13.8% as published on 2026-07-26) carries no location, so those rows cannot be placed in any neighbourhood and are not in this figure.
No ZIP code centroid falls inside the Dawson boundary, so we search the 5 nearest instead: 78704, 78701, 78741, 78744, 78745. We match ZIP codes to planning areas by testing each ZIP's centroid against the boundary polygon, so a large ZIP can overlap an area without its centre landing inside it. Use the boundary, not the ZIP, as the authority.