Express - Remove and dispose of existing roof covering and exterior siding. Re-roof 1300sqft using metal roofing over new synthetic underlayment. Re-side 1000 sqft with James Hardie fiber-cement siding over OSB sheathing. Total Project Scope includes like for like exterior weatherproofing with no structural wall relocations or changes to building footprint.
Jun 12Repair$1
🏗️
2026-063735 BPActive
205 E ST ELMO RD BLDG 2
Finish out for admin office.
May 29Remodel
🏗️
2026-060937 BPActive
407 TAMWORTH AVE
Express- Replace drywall that was removed for plumbing and electrical repairs. Replace insulation. Tub and shower conversion. Replace 1 entry door of the same size. Plumbing and electrical permits have been issued.