7 DAY - ADDED POWER FOR NEW OWNER EQUIPMENT. EXTENDING CHILLED WATER AND CDA LINES TO EQUIPMENT. - OVA
Jun 29Remodel
🏗️
2026-082367 BPActive
4016 TRAVIS COUNTRY CIR
Express: Shower to shower replacement
Jun 29Repair$1
🏗️
2026-077915 BPActive
6007 SUN VISTA DR
Master Bathroom Remodel: frame new shower pan size frame new shampoo niche frame new window opening frame new closet door entrance from bedroom and closet bathroom opening and close existing door update plumbing and electrical layout as per plan relocate plumbing fixtures as per plan new 4 recessed lights
Jun 29Addition and Remodel$1
🏗️
2025-159811 BPInactive Pending Revision
4706 CIRCLE OAK CV
addition to back of existing residence - covered patio(15 feet x 36 feet) outdoor space. no plumbing no air conditioning
Jun 26Addition and Remodel$30K
🏗️
2026-080967 BPActive
6101 PATTON RANCH RD
QT - Install shade structures at existing school - OVA
Jun 25Remodel
🏗️
2026-070678 BPFinal
5000 DESERT OAK CIR
Express- Foundation repair on a slab foundation. Install 16 total press piling pier locations along the perimeter. 5 breakthrough and patched locations. Improve level.
Jun 24Repair$1
🏗️
2026-077840 BPActive
6006 SUN VISTA DR
Express - Demo kitchen baths and walls in living to prepare for a remodel. Replace windows and siding. Will apply for an interior remodel permit
Jun 18Repair$1
🏗️
2026-012829 BPActive
5251 W US 290 HWY SVRD EB
This project includes the partial finish out of existing shell space within the B occupancy MOB in order to expand the existing oncology department. The scope includes additional infusion bags exam rooms offices and support spaces
Jun 17Remodel
🏗️
2026-072363 BPActive
4301 W WILLIAM CANNON DR BLDG B6 UNIT 108
Interior finish out of a portion of an existing building floor for a new tenant. The scope includes selective demolition; installation of new non structural partitions ceilings finishes and millwork; placement of furniture and equipment; and associated MEP improvements. Change of use from Personal Services to Restaurant. 2026 030657 DA.
Jun 15Remodel
🏗️
2026-072642 BPInactive Pending Revision
4514 CLIFFSTONE CV
Interior remodel
siding and window replacement interior finishes replaced den will be made into a bedroom half bath added kitchen remodeled primary bed and bath modified relocating walls and plumbing fixtures HVAC system replaced.
Revision:
The plan is approved and we are revising Smoke alarms are added (not shown on plans before) structural column is being removed and replaced with two large beams in the attic designed by a structural engineer (documentation will be attached) a window is added in front 3wx4h a French Door set in back is being enlarged from 8 wide to 12 wide and a side window on a bedroom is being reduced in size for privacy.
Jun 12Addition and Remodel$70K
🏗️
2026-060002 BPActive
5707 SOUTHWEST PKWY BLDG 2
ePlan: Commercial Expedited Review - Interior Remodel to Existing Business Lab (148132 SF).
Jun 12Remodel
🏗️
2026-072637 BPActive
5708 OAKCLAIRE DR
Express- Replace 6 existing windows -size for size
Jun 9Repair$9K
🏗️
2026-071685 BPActive
3230 TRAVIS COUNTRY CIR
New Construction fine arts building for private school
SP-2023-0293C - Approved
Jun 9New$26K
🏗️
2025-043628 BPFinal
5301 SOUTHWEST PKWY BLDG 1 UNIT 220
Interior remodel with storage and break room. Change the front door to accommodate for new suite and create a small area of corridor-area to the right is open to below
Jun 8Remodel
🏗️
2026-067065 BPActive
5708 OAKCLAIRE DR
Express- Replace 6 existing windows size for size
May 29Repair$1
🏗️
2026-065425 BPActive
7171 SOUTHWEST PKWY BLDG B100
Interior Remodel to Add Door and Glass Wall for B100
May 29Remodel
🏗️
2026-064397 BPActive
6501 RIDGE OAK RD
Total demo of SFR 1483 sq ft circa 1960
***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
May 27Demolition
🏗️
2026-060403 BPActive
5704 PARKWOOD DR
Interior remodel and Garage conversion
May 27Addition and Remodel$1
🏗️
2026-058601 BPActive
4501 GRIDER PASS
Interior Remodel of both bathrooms and kitchen.
May 21Addition and Remodel$1
🏗️
2026-058225 BPActive
7200 SQUIRREL OAK CIR
Express- Remove and replace 10 windows and 2 entry doors like for like no structural changes
May 9Repair$1
🏗️
2026-055457 BPActive
4331 SENDERO DR
Express: Replace 1 existing sliding glass patio door - size for size
May 6Repair$1
🏗️
2026-055243 BPActive
5000 MISSION OAKS BLVD UNIT 46
Express: Remove and replace windows (like for like)
May 4Repair$1
🏗️
2026-054163 BPFinal
5219 MOON SHADOW DR
Express: Re-roof
May 1Repair$1
🏗️
2026-053429 BPActive
6016 MORNING DEW DR
Addition and remodel
Remodel of exist main level demo of unpermitted concrete patio and patio cover in its entirety existing wood patio in its entirety demo of project north exterior wall to prepare for addition demo of interior finishes new addition to include new primary suite extension of exist kitchen/dining new laundry existing electric meter to be relocated
Apr 30Addition and Remodel$1
🏗️
2026-050927 BPActive
5113 SOUTHWEST PKWY UNIT 175
7 DAY - Interior remodel of existing office space - OVA