Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units
Unit 301
Jun 18Remodel
🏗️
2026-071362 BPActive
808 E 31ST ST
Install new 20x10 inground concrete pool with a 1 width coping pool area will be 22x12 and total depth will be 5
Jun 10New
🏗️
2026-071352 BPActive
1000 E 41ST ST BLDG J UNIT 200A
Change of use to personal services with second-gen finish out
Jun 8Remodel
🏗️
2026-056929 BPFinal
3906 WILLBERT RD
Express- Foundation repair on a pier and beam structure. Install 18 spread footing sonotube piers and 98 of 4x6 beam for support. Improve level.
Jun 1Repair$1
🏗️
2026-067566 BPFinal
3906 WILLBERT RD
Express: replace window like for like
May 28Repair$1
🏗️
2026-055638 BPActive
504 E 38TH HALF ST
Interior Remodel- minor changes to structural framing updates to electrical plumbing hvac.
May 12Addition and Remodel$1
🏗️
2025-082882 BPActive
1000 E 41ST ST
Install new 100.00 KWDC Rooftop solar system servicing existing commercial.
May 6Remodel
🏗️
2026-053797 BPFinal
714 E 32ND ST
Express: Replacement of 3 windows like for like
May 1Repair$1
🏗️
2026-048545 BPActive
1021 E 43RD ST
Interior remodel and addition to an existing single-family house adding 1-bedroom 1-bath family room laundry a rear covered porch and an attached unconditioned storage room.
Apr 21Addition and Remodel$1
🏗️
2026-031792 BPActive
504 E 38TH HALF ST
Non-structural exploratory work to remove wallboards and fixtures inside and outside.