← All Neighborhoods
NORTH AUSTIN CIVIC ASSOCIATION
Construction permits, major projects, and restaurant inspections for this area.
Show:
Period:
Loading map...
🏛️
Major Projects
3 projects in selected period
🍽️
Restaurant Inspections
15 inspections in selected period
79
Tan My Restaurant
1601 Ohlen Rd Austin, 78758-7101
Nov 7Fair
100
Jaime D. Padron Elementary
2011 W Rundberg Ln Austin, 78758-5946
Nov 5Excellent
96
Wooldridge Elementary
1412 Norseman Ter Austin, 78758-6529
Nov 5Excellent
94
Settlement Home for Children, The
1600 Payton Gin Rd Austin, 78758-6506
Nov 5Excellent
95
Jack in the Box #848
8630 N Lamar Blvd Austin, 78753-5545
Nov 4Excellent
92
Dairy Queen
8728 N Lamar Blvd Austin, 78753-5424
Nov 4Excellent
97
Coco's Cafe
8557 RESEARCH NB BLVD Unit 118 AUSTIN, 78758
Oct 30Excellent
85
Express Food Mart #7
10500 N Lamar Blvd Austin, 78758
Oct 28Fair
99
Ramen Tatsuya I LLC
8557 RESEARCH NB BLVD Unit 126 AUSTIN, 78758
Oct 28Excellent
84
Viva Food Mart - Taqueria
8610 N Lamar Blvd Ste 100 Austin, 78753-5547
Oct 28Fair
96
Taco Cabana #203
8415 RESEARCH NB BLVD AUSTIN, 78758
Oct 24Excellent
99
Navarro High School
1201 Payton Gin Rd Austin, 78758-6616
Oct 24Excellent
94
Taco More
1325 Rutland Dr Austin, 78758-6240
Oct 21Excellent
84
7-Eleven Convenience Store #25445A
8900 N Lamar Blvd Austin, 78753-5012
Oct 21Fair
90
El Tacorrido
9320 N Lamar Blvd Austin, 78753-4104
Sep 25Excellent
🏗️
Building Permits
17 permits in selected period
🏗️
2025-119174 BPActive
9400 GROUSE MEADOW LN BLDG D
As built permit for exterior staircase landing repair unit D. Like for like work completed. Replace deteriorated wood. Exterior only no MEP no fire systems no structure steel or concrete no footprint/impervious cover change no change of use/occupant load
Oct 31Remodel
🏗️
2025-131716 BPActive
8130 N LAMAR BLVD SB
ATT is proposing to install on tower 1 mount modification per plans attached 3 new radio antennas 3 remote radio units RRU 3 10 pipe arms for RRUs. Ground scope of work to install 1 DC power plant 11 48V DC rectifiers 10 DC converters 1 48V battery rack 24 170AH batteries 6 50A DC breakers. No change of tower height nor ground disturbance.
Oct 17Remodel
🏗️
2025-131031 BPFinal
1005 QUAIL PARK DR
Electrical: Change old panel to new remove aluminum wire and install new copper wires. Add fans to each room. Add outlets. Add can lighting. Plumbing: Change out sinks/faucets to new in all bathrooms and kitchen. Add 1 sink/faucet in the jack and jill bathroom. Flooring: Install LVP Flooring Drywall: Repair & Paint.
Oct 10Addition and Remodel$1