← All Neighborhoods

WEST UNIVERSITY

Construction permits, major projects, and restaurant inspections for this area.

Show:
Period:
Loading map...
🍽️

Restaurant Inspections

15 inspections in selected period

85
Dirty Martin's Place
2808 Guadalupe St Austin, 78705-3704
Jan 27Fair
97
Zeta Tau Alpha Sorority
2711 Nueces St Austin, 78705-4014
Jan 20Excellent
98
Delta Delta Delta
503 W 27th St Austin, 78705-4006
Jan 20Excellent
58
Musashino Sushi Dokoro
2905 San Gabriel St Ste 200 Austin, 78705-3539
Jan 15Needs Work
92
Foodheads
616 W 34th St Austin, 78705-1203
Jan 13Excellent
95
Alpha Epsilon Phi
2500 Rio Grande St Austin, 78705-4524
Jan 13Excellent
93
Hopfields
3110 Guadalupe St Ste 400 Austin, 78705-2800
Jan 13Excellent
96
Phi Kappa PSI Fraternity House
2501 Nueces St Austin, 78705-4521
Jan 12Excellent
78
Halal Bros
2712 Guadalupe St Austin, 78705-3702
Jan 12Fair
86
Alpha Xi Delta
2508 Rio Grande St Austin, 78705-4529
Jan 12Fair
93
Alpha Chi Omega
2420 Nueces St Austin, 78705-4811
Jan 12Excellent
100
Delta Gamma
2419 Rio Grande St Austin, 78705-4818
Jan 12Excellent
91
VIA 313 Pizza
3016 Guadalupe St Austin, 78705-2862
Jan 12Excellent
98
Zalat Pizza
2222 Rio Grande St # Bunit # 190 Austin, 78705-5110
Jan 8Excellent
100
Starbucks Coffee Company #65081
611 W 22nd St Austin, 78705-5115
Jan 8Excellent
🏗️

Building Permits

25 permits in selected period

🏗️
2026-022585 BPActive
2400 SAN GABRIEL ST
Swimming Pool remodel
Feb 26Remodel
🏗️
2026-022229 BPActive
2515 LEON ST
2026/02/20 - 2026/02/28 | (2026/02/19) | Moms weekend consisting of members and their moms gathering. March madness consists of an event themed for the NCAA march madness tournament. #Greek
Feb 25New
🏗️
2026-017097 BPActive
2506 PEARL ST
2026/03/07 | An annual event with a performing artist. #Greek
Feb 17New
🏗️
2026-012668 BPActive
3014 WASHINGTON SQ
Removal of All kitchen cabinets countertops and appliances for Existing Religious Assembly
Feb 9Remodel
🏗️
2023-144147 BPActive
2708 SAN PEDRO ST
Replacing exterior siding around the 10x10 exterior elevator shaft. Siding will be replaced with same style James Hardie siding.
Feb 9Remodel
🏗️
2025-133410 BPActive
2502 LEON ST UNIT 100
Repair exterior damaged stone and sealants from vehicle damage.
Feb 5Remodel
🏗️
2026-009490 BPActive
1115 W 22ND HALF ST
Garage Conversion to study and workout space including bathroom
Feb 3Addition and Remodel$1
🏗️
2025-163472 BPActive
2246 GUADALUPE ST
Interior renovation to the basement level of an existing mercantile space to include accessible route from existing elevator to existing mercantile area. New elevator replacement permitted separately not in this scope of work. No access control. No MEP scope.
Feb 2Remodel
🏗️
2026-009554 BPFinal
3000 WASHINGTON SQ
Express- Replace siding
Jan 27Repair$1
🏗️
2026-001926 BPActive
2216 SAN GABRIEL ST
REBUILD OF WALKWAYS AND LANDING
Jan 21Remodel
🏗️
2026-006025 BPActive
2806 SAN PEDRO ST UNIT B
UNIT 102: (north Unit: New 1st floor unit of triplex 3 bathroom 3 bedroom shared patio & porch w/ other units.. Part of 2-story triplex 3-unit use.
Jan 16New
🏗️
2026-006024 BPActive
2806 SAN PEDRO ST UNIT A
UNIT 101: (south unit): New 1st floor unit of triplex 3 bathroom 3 bedroom shared patio & porch w/ other units. Part of 2-story triplex 3-unit use.
Jan 16New
🏗️
2026-006027 BPActive
2806 SAN PEDRO ST UNIT C
UNIT 201: New 2nd floor unit of triplex 6.5 bathroom 6 bedroom patio & porch. Part of 2-story triplex 3-unit use.
Jan 16New
🏗️
2026-003145 BPActive
623 W 38TH ST UNIT 105
7 DAY Remodel existing admin office
Jan 16Remodel
🏗️
2025-163520 BPActive
2821 SALADO ST
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5bath]. 2821 SALADO ST
Jan 9New
🏗️
2025-163521 BPActive
711 1/2 W 28TH HALF ST
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5bath]. 711 1/2 W 28TH HALF ST
Jan 9New
🏗️
2026-000878 BPActive
2813 RIO GRANDE ST
CHANGE OF USE FOR THE FRONT BUILDING ONLY. BACK BUILDING NOT PART OF THIS PROJECT. SPE APPROVED. There are no changes being done to either building on this lot and/or the lot itself. No changes to electrical or plumbing.
Jan 7Remodel
🏗️
2026-001805 BPActive
2300 NUECES ST
80 Mil fleece back TPO layover installation.
Jan 7Remodel
🏗️
2025-162484 BPFinal
609 W 32ND ST
Express: Roof repair
Dec 29Repair$1
🏗️
2025-160016 BPActive
3408 WEST AVE
CHANGE OF USE from Pharmacy to Personal Services including an Interior Remodel 2025 092454 DA - Approved
Dec 29Remodel
🏗️
2025-160324 BPActive
2246 GUADALUPE ST
Interior remodel to 4th floor office area of existing retail space. New exterior windows. Access Control.
Dec 26Remodel
🏗️
2025-157780 BPActive
704 W 21ST ST UNIT 306
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
Dec 22Remodel
🏗️
2025-157774 BPActive
704 W 21ST ST UNIT 208
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
Dec 22Remodel
🏗️
2025-157767 BPActive
704 W 21ST ST UNIT 201
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
Dec 22Remodel
🏗️
2025-157778 BPActive
704 W 21ST ST UNIT 304
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
Dec 22Remodel