Express- Foundation repair. Install 12 cmu 54 ft of beam 24 ft of floor joist and adjusting off existing piers.
Jun 25Repair$1
🏗️
2026-010878 BPActive
2519 HARRIS BLVD
New pool (autofill)
Jun 15New
🏗️
2026-010876 BPActive
2519 HARRIS BLVD
ePlan: Residential Expedited Review - New TWO UNIT RES. New construction of a 2-Story Single Family Res. [3bed 3.5bath]
Jun 15New
🏗️
2026-073841 BPActive
1404 W 30TH ST
Express: Foundation Repair
Jun 11Repair$1
🏗️
2026-066256 BPActive
1201 W 38TH ST
7 DAY - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing CUP remove the indoor domestic water storage tank and install a new domestic water storage tank on new concrete pad outside of the CUP - OVA
Jun 9Remodel
🏗️
2026-038020 BPActive
1611 PRESTON AVE
Addition and Remodel
Addition and renovation of an existing one story SFR resulting into a two story 3 bedroom 405 bath
Jun 8Addition and Remodel$1
🏗️
2026-066286 BPActive
1201 W 38TH ST
First time finish out - No commercial kitchen No food prep all prepackaged food
Jun 5Remodel
🏗️
2026-068977 BPActive
2512 HARRIS BLVD
Express: Swapping out existing water heater for tankless and adding electrical outlet for unit
Jun 4Repair$8K
🏗️
2026-067576 BPActive
3212 GLENVIEW AVE
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 4bath] Work to include: Second Floor Addition First floor interior remodel Patio conversion new beds new baths [5bed 5bath].
Jun 2Addition and Remodel$1
🏗️
2026-069302 BPActive
3300 BRYKER DR
Express: Foundation Repair
Jun 2Repair$1
🏗️
2026-064150 BPActive
1403 HARDOUIN AVE
Total demo of detached carport 550 sq ft circa 1979
***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
May 22Demolition
🏗️
2026-053675 BPActive
2602 WOOLDRIDGE DR
New pool (autofill/heated)
May 21New
🏗️
2026-053672 BPActive
2602 WOOLDRIDGE DR
ePlan: Residential Expedited Review - New Second Unit: Existing Single Family Res to Remain As Is. New construction of 2-story SF Res [1bed 1bath]
May 21New
🏗️
2026-053674 BPActive
2602 WOOLDRIDGE DR
New 1-story Cabana
May 21New
🏗️
2026-057828 BPActive
1413 ETHRIDGE AVE
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 4.5bath] Work to include: First floor addition Interior remodel new Attached Garage new bath [4bed 3.5bath].
May 19Addition and Remodel$1
🏗️
2026-057829 BPActive
1413 ETHRIDGE AVE
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story *Guest House* [1bed 1bath] Work to include: First floor addition Patio conversion new Porch.
May 19Addition and Remodel$1
🏗️
2026-056089 BPActive
1605 NORTHWOOD RD
Express: Foundation repair
May 13Repair$1
🏗️
2026-042598 BPActive
1413 GASTON AVE
ePlan: Residential Expedited Review - Interior Remodel Only to Existing 1-Story Single Family Res. [4bed 4bath]
6/26/26 SM ** REVISED ** Kitchen peninsula being rebuilt Adding a fireplace where study was converting the gym to bedroom 4 and adding a wall to create a kitchenette New shower pan in bath 4 all new primary bath reduce bed 2 for primary closet cosmetic updates in bath 2 and 3. New lighting and conductors throughout the home add receptacles where required in areas in the scope.
May 7Remodel
🏗️
2026-025639 BPActive
2504 JARRATT AVE
new inground pool (270sqft) and spa (49 sqft) in back of property
IC @ 44.84%
Apr 24New
🏗️
2025-058167 BPActive
3000 BRYKER DR
uncovered new deck
Apr 22Addition and Remodel$1
🏗️
2026-029173 BPActive
3309 KERBEY LN
HVAC replacement - Building B
Apr 21Remodel
🏗️
2026-029172 BPActive
3309 KERBEY LN
HVAC Electrical panel and window replacement - Building A
Apr 21Remodel
🏗️
2026-047516 BPFinal
3202 BEVERLY RD
Addition to existing 2-story single-family residential to include: 1st story addition of half bath; 2nd story addition of laundry room.
4/23/26 SM - REVISED ** Remodel of existing utility room into a powder bath. Converting attic space into a new laundry room on the second floor. Beam over dining room was elevated to accommodate the new laundry floor.
Apr 20Addition and Remodel$1
🏗️
2026-045360 BPActive
1301 W 38TH ST UNIT 102
Interior remodel of medical office tenant space in existing 7-story office building
Apr 20Remodel
🏗️
2026-046746 BPFinal
1501 NORTHWOOD RD
Express: Replacing the existing metal roof with a new. Installing new decking.